Only recently, I wrote about adjudicators’ jurisdiction under the Construction Contracts Act 2002, and in particular whether an adjudicator’s jurisdiction is limited to the notice of adjudication. The key point in that discussion was that the notice remains important, but it does not necessarily provide the complete jurisdictional map. The better approach is to identify the real dispute properly referred under the statutory process as a whole, while remaining alert to the limits imposed by natural justice and procedural fairness.
The recent English TCC decision in Premier Modular Ltd v Maidstone and Tunbridge Wells NHS Trust [2026] EWHC 1404 (TCC) provides a useful companion to that discussion. Although it arises under the English adjudication regime and an NEC4 contract, the principle is highly relevant to adjudication practice more generally: an adjudicator may analyse the dispute robustly and is not confined to simply choosing between the parties’ submissions, but must not decide the case on a materially different and decisive basis without giving the parties a fair opportunity to respond. In that sense, Premier Modular is not merely a case about NEC compensation events or Accepted Programmes. It is a case about the boundary between legitimate adjudicative reasoning and procedural unfairness. It illustrates that a broad notice of adjudication may answer a jurisdictional objection, but it will not necessarily cure a natural justice problem if the decision ultimately turns on a case that neither party actually had the opportunity to address.
0 Comments
|
AuthorJoem is a Dispute Resolution Practitioner, Construction Law specialist and a practicing Quantity Surveyor with a strong background in Civil Engineering and Project Management. Archives
October 2026
Categories
All
|
RSS Feed